

The hydropower plant’s impact on the ecosystem of the region and the cost of construction and initial studies necessitate the initial, accurate, and reliable analysis to be considered the optimal site for the project. Therefore, different parameters and conditions should be considered in choosing the optimal site of the hydropower plant.
The present invention has been developed in view of site spotting run-of-river hydropower plant projects based on technical and engineering parameters. This system can be generalized to large areas with different geographical conditions.